
Technical Specifications
Intelligence
Compliance
ISM; Fire drills; Abandon ship drills; Fire detection and alarm system; Garbage shipboard handling; Rescue boat inventory; Fire-dampers; Establishment of working language onboard; Ventilators, air pipes, casings; Rescue boats; Launching arrangements for rescue boats; Immersion suits; Galley, handlingroom (maintenance); Means of escape; Fire pumps and its pipes; Muster list; Sewage treatment plant; Propulsion main engine; Entry dangerous spaces; Auxiliary engine; Oil record book; Adequate lighting - mooring arrangements; Lifeboats; Ventilation
Evaluation of crew performance (fire drills); Rescue boats; On board training and instructions; Propulsion main engine; Atmosphere testing instrument; ISM
Rescue boats; Fire-dampers
Port-State-Control detentions.
Composite Risk
Strong, corroborated adverse evidence — a detention, sanctions exposure or an AIS-gap / behavioural signal.
A coverage-weighted blend of the 3 components we could read for this hull — the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Estimated
Other · summer draught 4 m · 14.1 t per cm immersion
Estimate only — modelled from deadweight (deadweight regression) using a first-principles hydrostatic model, not measured hydrostatic tables. The design draught it is anchored to is unreliable across the fleet.
Commercial

Visual Archive
Explore More