
Technical Specifications
Intelligence
Compliance
ISM; Fire drills; Abandon ship drills; Fire detection and alarm system; Garbage shipboard handling; Rescue boat inventory; Fire-dampers; Establishment of working language onboard; Ventilators, air pipes, casings; Rescue boats; Launching arrangements for rescue boats; Immersion suits; Galley, handlingroom (maintenance); Means of escape; Fire pumps and its pipes; Muster list; Sewage treatment plant; Propulsion main engine; Entry dangerous spaces; Auxiliary engine; Oil record book; Adequate lighting - mooring arrangements; Lifeboats; Ventilation
Evaluation of crew performance (fire drills); Rescue boats; On board training and instructions; Propulsion main engine; Atmosphere testing instrument; ISM
Rescue boats; Fire-dampers
Port-State-Control detentions.
Composite Risk
Strong, corroborated adverse evidence: a detention, sanctions exposure or an AIS-gap / behavioural signal.
A coverage-weighted blend of the 3 components we could read for this hull; the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Estimated
Other · summer draught 4 m · 14.1 t per cm immersion
Estimate only: modelled from deadweight (deadweight regression) using a first-principles hydrostatic model, not measured hydrostatic tables. The design draught it is anchored to is unreliable across the fleet.
Commercial
Price it in the Route Planner between any two commercial ports: ballast and laden legs, two fuels at live bunker prices, port and canal costs, the weather on the way, and the TCE set against the market.
Typical Coaster speed and burn. Replace them with the ship's own figures in the planner.

Visual Archive
Explore More