
Technical Specifications
Intelligence
Compliance
Minimum Safe Manning Document; Medical Equipment, medical chest, medical guide; Endorsement by flagstate; Manning specified by the minimum safe manning doc; Shipboard working arrangements; Charts; Division - decks,bulkheads and penetrations; Windows, sidescuttles and deadlights; Fire doors/openings in fire-resisting divisions; Fire drills; ISM; Electrical
International code of signals-SOLAS; Voyage or passage plan; Ready availability of fire fighting equipment; Cleanliness of engine room; ISM; Nautical publications; Fire drills; Bilge pumping arrangements
ISM; Crew familiarization with Emergency Systems; Other (SOLAS operational); Fire drills; Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Charts; Retention of oil on board; Atmosphere testing instrument; Bulkheads - cracking; Enclosed space entry and rescue drills; ISM
Port-State-Control detentions.
Composite Risk
Strong, corroborated adverse evidence: a detention, sanctions exposure or an AIS-gap / behavioural signal.
A coverage-weighted blend of the 3 components we could read for this hull; the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Estimated
Other · summer draught 5.04 m · 10.5 t per cm immersion
Estimate only: modelled from deadweight (deadweight only) using a first-principles hydrostatic model, not measured hydrostatic tables. The design draught it is anchored to is unreliable across the fleet.
Commercial
Price it in the Route Planner between any two commercial ports: ballast and laden legs, two fuels at live bunker prices, port and canal costs, the weather on the way, and the TCE set against the market.
Typical Coaster speed and burn. Replace them with the ship's own figures in the planner.
Explore More