
Technical Specifications
Intelligence
Verified reported figure. Band is peer-relative, not official IMO CII.
Compliance
Bilge pumping arrangements; Ventilators, air pipes, casings; Gyro compass; Lights, shapes, sound-signals; Electrical installations in general; Hull – construction; ISM
Fire detection and alarm system; ISM; Covers (hatchway-, portable-, tarpaulins, etc.); Gyro compass; Machinery controls alarm; Doors; Rescue boats; Fixed fire extinguishing installation; Fire doors/openings in fire-resisting divisions; UMS - alarms; Windows, sidescuttles and deadlights; Functionality of Safety Systems; Rescue boats; Evaluation of crew performance (fire drills); Heating, air conditioning and ventilation; Dangerous areas
Port-State-Control detentions.
Composite Risk
Strong, corroborated adverse evidence — a detention, sanctions exposure or an AIS-gap / behavioural signal.
A coverage-weighted blend of the 3 components we could read for this hull — the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Estimated
Other · summer draught 3 m · 10.2 t per cm immersion
Estimate only — modelled from deadweight (deadweight regression) using a first-principles hydrostatic model, not measured hydrostatic tables. The design draught it is anchored to is unreliable across the fleet.
Commercial

Visual Archive
Explore More