Technical Specifications
Intelligence
Compliance
Muster list; Fire doors/openings in fire-resisting divisions; Emergency equipment for 2-way comm.; Fire-dampers; Operation of GMDSS equipment; Fire detection and alarm system; Charts; Voyage data recorder (VDR) / Simplified Voyage data recorder (S-VDR); Bridge operation; Personal equipment for fire safety; Fire drills; Cleanliness; ISM
Fire drills; Abandon ship drills; Fire detection and alarm system; Stowage and provision of liferafts; Launching arrangements for survival craft; Embarkation arrangement survival craft; Lifeboats; ISM
Port-State-Control detentions.
Build Series


Sister hulls share a yard, segment, build year (±1) and deadweight (±3%): the cleanest comparables for valuation. Derived in-house from our fleet register; coverage is limited to hulls carrying a recorded builder, so a series may be incomplete.
Composite Risk
Strong, corroborated adverse evidence: a detention, sanctions exposure or an AIS-gap / behavioural signal.
A coverage-weighted blend of the 3 components we could read for this hull; the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Estimated
Other · summer draught 3.9 m · 17.1 t per cm immersion
Estimate only: modelled from deadweight (deadweight regression) using a first-principles hydrostatic model, not measured hydrostatic tables. The design draught it is anchored to is unreliable across the fleet.
Commercial
Price it in the Route Planner between any two commercial ports: ballast and laden legs, two fuels at live bunker prices, port and canal costs, the weather on the way, and the TCE set against the market.
Typical Coaster speed and burn. Replace them with the ship's own figures in the planner.

Visual Archive
Explore More