
Technical Specifications
Intelligence
Verified reported figure. Band is peer-relative, not official IMO CII.
Compliance
Covers (hatchway-, portable-, tarpaulins, etc.); Heating, air conditioning and ventilation; Radio log (diary); Navigation bridge visibility; Nautical publications; Charts; Compass correction log; Doors; Stability/strength/loading information and instruments; Fire drills; Beams, frames, floors-corrosion; Bulkheads - cracking; Ventilation; ISM
Charts; Nautical publications; Lifeboats; Fire doors/openings in fire-resisting divisions; Auxiliary engine; Jacketed high pressure lines and oil leakage alarm; Communication-SOLAS chap. 5; Fire drills; Fire fighting equipment and appliances; ISM
Port-State-Control detentions.
Composite Risk
Strong, corroborated adverse evidence — a detention, sanctions exposure or an AIS-gap / behavioural signal.
A coverage-weighted blend of the 3 components we could read for this hull — the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Estimated
Other · summer draught 5.13 m · 10.9 t per cm immersion
Estimate only — modelled from deadweight (deadweight only) using a first-principles hydrostatic model, not measured hydrostatic tables. The design draught it is anchored to is unreliable across the fleet.
Commercial
Explore More