
Technical Specifications
Intelligence
Compliance
Facilities for reception of marine safety inform.; Fire detection and alarm system; Navigation bridge visibility; Jacketed high pressure lines and oil leakage alarm; Jacketed high pressure lines and oil leakage alarm; Jacketed high pressure lines and oil leakage alarm; Auxiliary engine; Fixed fire extinguishing installation; Sewage treatment plant; UMS - Ship
Other (MARPOL Annex IV); SOPEP; Stability Information Booklet; Magnetic compass; ISM; Fixed fire extinguishing installation; Fire fighting equipment and appliances; Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces; Steering gear; Magnetic compass; Evaluation of crew performance (fire drills); Cleanliness of engine room; Ballast, fuel and other tanks; Fire control plan
Port-State-Control detentions.
Composite Risk
Strong, corroborated adverse evidence — a detention, sanctions exposure or an AIS-gap / behavioural signal.
A coverage-weighted blend of the 3 components we could read for this hull — the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Estimated
Other · summer draught 4.9 m · 11.4 t per cm immersion
Estimate only — modelled from deadweight (deadweight regression) using a first-principles hydrostatic model, not measured hydrostatic tables. The design draught it is anchored to is unreliable across the fleet.
Commercial

Visual Archive
Explore More