
Technical Specifications
Overview
USNS Pecos (T-AO-197) is a Henry J. Kaiser-class underway replenishment oiler operated by the Military Sealift Command to support ships of the United States Navy, and the third such ship to be named after the Pecos River. Pecos, the eleventh Henry J. Kaiser-class ship, was laid down on 17 February 1988 at Avondale Shipyards in New Orleans, Louisiana, and launched on 23 September 1989. She was delivered to the Navy and placed in non-commissioned service with a primarily civilian crew under the control of the Military Sealift Command on 6 July 1990. The ship is equipped with a helicopter platform to allow for at-sea transfer of personnel and supplies. Pecos is part of the MSC Naval Auxiliary Force, MSC Pacific, in the United States Pacific Fleet, and has received the National Defense Service Medal, the Armed Forces Expeditionary Medal twice, and the Southwest Asia Service Medal.
Composite Risk
Multiple adverse factors, or a hard ship-specific signal, lift this hull above the fleet norm.
A coverage-weighted blend of the single component we could read for this hull; the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. This headline is flagged low-confidence (a thin or structural-only read) and should not be treated as a verdict. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Commercial
Price it in the Route Planner between any two commercial ports: ballast and laden legs, two fuels at live bunker prices, port and canal costs, the weather on the way, and the TCE set against the market.

Visual Archive