
Technical Specifications
Intelligence
Verified reported figure. Band is peer-relative, not official IMO CII.
Compliance
ISM; Fire drills; Abandon ship drills; Ventilation; Fire pumps and its pipes; Emergency fire pump and its pipes; Ready availability of fire fighting equipment; Propulsion main engine; Auxiliary engine; Gauges,thermometers, etc; Steam pipes, pressure pipes, wires (insulation); Garbage shipboard handling; Cleanliness of engine room; Lifeboats; Covers (hatchway-, portable-, tarpaulins, etc.); Mooring Ropes/Lines and Wires; Insulation; Electrical installations in general; VHF radio installation; Lights, shapes, sound-signals; Fire doors/openings in fire-resisting divisions; Sanitary Facilities; Messroom and recreational facilities; Galley, handlingroom (maintenance); Provisions quality and nutritional value; Laundry, Adequate Locker; Cold room, cold room cleanliness, cold room temperature; Doors; Establishment of working language onboard; Winches & capstans; Radar; Windows, sidescuttles and deadlights; Navigation bridge visibility; Signs, indications; Emergency, lighting,batteries and switches; On board training and instructions
Port-State-Control detentions.
Composite Risk
Multiple adverse factors, or a hard ship-specific signal, lift this hull above the fleet norm.
A coverage-weighted blend of the 3 components we could read for this hull — the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Estimated
Other · summer draught 8.3 m · 32.3 t per cm immersion
Estimate only — modelled from deadweight (deadweight regression) using a first-principles hydrostatic model, not measured hydrostatic tables. The design draught it is anchored to is unreliable across the fleet.
Commercial
Explore More