
Technical Specifications
Overview
SS Dolphin IV (formerly Zion of Zim Lines), was built in Germany as war reparations for Israel in 1956. She subsequently sailed as Amelia De Melo and Ithaca. In 1978, the ship was renamed Dolphin IV when she sailed under sales and marketing agreement for Paquet Ulysses Cruises, which was part of Paquet French Cruises. The owners of Ulysses Cruises/Florida Nautica made the decision in 1984 to handle the sales and marketing for the ship. This is when Dolphin Cruise Lines was created. The ship has retained her name through her most recent sale to Cape Canaveral Cruise Line in 1995. The ship remained in operation for Cape Canaveral Cruise Line until September 2000 when it was forced out of service because it needed 3.5 million dollars in required maintenance. The cruise line was unable to secure another vessel and it was unable to afford or receive funding for the needed repairs. As a result, the ship was forced to lay up at Freeport, Bahamas for three years awaiting repairs. Due to the state of disrepair of fresh water and sewage holding facilities, the ship was sold for scrap in 2003.
Composite Risk
Multiple adverse factors, or a hard ship-specific signal, lift this hull above the fleet norm.
A coverage-weighted blend of the single component we could read for this hull; the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. This headline is flagged low-confidence (a thin or structural-only read) and should not be treated as a verdict. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Commercial
Price it in the Route Planner between any two commercial ports: ballast and laden legs, two fuels at live bunker prices, port and canal costs, the weather on the way, and the TCE set against the market.

Visual Archive