
Technical Specifications
Overview
The SS Chanute Victory was a Victory ship built during World War II under the Emergency Shipbuilding program. She was launched by the California Shipbuilding Company on January 19, 1945, and completed on February 20, 1945. The ship's United States Maritime Commission designation was VC2- S- AP3, hull number 79 (V44).
Composite Risk
Multiple adverse factors, or a hard ship-specific signal, lift this hull above the fleet norm.
A coverage-weighted blend of the single component we could read for this hull; the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. This headline is flagged low-confidence (a thin or structural-only read) and should not be treated as a verdict. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Commercial
Price it in the Route Planner between any two commercial ports: ballast and laden legs, two fuels at live bunker prices, port and canal costs, the weather on the way, and the TCE set against the market.

Visual Archive