
Technical Specifications
Intelligence
Compliance
Civil liability for Bunker oil pollution damage cert; Minimum Safe Manning Document; Seafarers' employment agreement (SEA); Non-payment of wages; Ship specific plans for the recovery of persons from the water; 15 PPM Alarm arrangmts.; Emergency, lighting,batteries and switches; Evaluation of crew performance (fire drills); Charts; Nautical publications; Fire detection and alarm system; Division - decks,bulkheads and penetrations; Radar; Propulsion main engine; Fire-dampers; Fire safety operational booklet; Decks - corrosion; Means of escape; Emergency fire pump and its pipes
Water, pipes, tanks; Rescue boats; ISM; Radar; Nautical publications; Closing devices/watertight doors
Fire detection and alarm system; MF/HF Radio installation; Satellite EPIRB 406MHz; Fire doors/openings in fire-resisting divisions; ISM
Port-State-Control detentions.
Composite Risk
Strong, corroborated adverse evidence — a detention, sanctions exposure or an AIS-gap / behavioural signal.
A coverage-weighted blend of the 3 components we could read for this hull — the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Estimated
Other · summer draught 4.8 m · 8.7 t per cm immersion
Estimate only — modelled from deadweight (hull geometry) using a first-principles hydrostatic model, not measured hydrostatic tables. The design draught it is anchored to is unreliable across the fleet.
Commercial

Visual Archive
Explore More