
Technical Specifications
Live Tracking
Most time stopped at Venice — 47 h across 2 stays.
Derived from the AIS track — runs of near-zero speed (anchored, moored or drifting) snapped to the nearest port. Builds up as we observe the vessel.
Intelligence
Verified reported figure. Band is peer-relative, not official IMO CII.
AIS-derived from our live feed.
Compliance
Crew familiarization with Emergency Systems; Manning specified by the minimum safe manning doc; Galley, handlingroom (maintenance); Heating, air conditioning and ventilation; Fire doors/openings in fire-resisting divisions; Evaluation of crew performance (fire drills); Cleanliness of engine room; Steering gear
Maintenance and inspections; Seafarers' employment agreement (SEA); Ship specific plans for the recovery of persons from the water; Stowage and provision of liferafts; Launching arrangements for rescue boats; Launching arrangements for rescue boats; Ready availability of fire fighting equipment; Provisions quantity; Fire prevention structural integrity; Fire drills; ISM; Means of escape
Port-State-Control detentions.
Operational Status
Making way at sea speed on its latest broadcast.
Read from the single most-recent AIS broadcast we hold for this hull — we keep no position history, so this is a point-in-time posture, not a dwell inference. Derived in-house from our own AIS feed; weight it by the broadcast age above.
Composite Risk
Strong, corroborated adverse evidence — a detention, sanctions exposure or an AIS-gap / behavioural signal.
A coverage-weighted blend of the 3 components we could read for this hull — the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Estimated
Other · summer draught 3.6 m · 16.2 t per cm immersion
Estimate only — modelled from deadweight (deadweight regression) using a first-principles hydrostatic model, not measured hydrostatic tables. The design draught it is anchored to is unreliable across the fleet.
Commercial
Explore More