
Technical Specifications
Intelligence
Compliance
Launching arrangements for survival craft; Electronic charts (ECDIS); Abandon ship drills; Evaluation of crew performance (fire drills); Fire pumps and its pipes; ISM
Propulsion main engine; ISM
Propulsion main engine; Propulsion main engine; Gauges,thermometers, etc; ISM
Port-State-Control detentions.
Composite Risk
Strong, corroborated adverse evidence — a detention, sanctions exposure or an AIS-gap / behavioural signal.
A coverage-weighted blend of the 3 components we could read for this hull — the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Estimated
Other · summer draught 5.6 m · 14.7 t per cm immersion
Estimate only — modelled from deadweight (hull geometry) using a first-principles hydrostatic model, not measured hydrostatic tables. The design draught it is anchored to is unreliable across the fleet.
Commercial
Explore More