
Technical Specifications
Intelligence
Verified reported figure. Band is peer-relative, not official IMO CII.
Compliance
Cold room, cold room cleanliness, cold room temperature; Fire alarm; Oil filtering equipment; Auxiliary engine; Oil record book; Endorsement by flagstate; ISM; Charts; Nautical publications
Voyage or passage plan; Garbage management plan; Fire doors/openings in fire-resisting divisions; Ready availability of fire fighting equipment; Beams, frames, floors-corrosion; Maintenance and inspections; Fire fighting equipment and appliances; Evaluation of crew performance (fire drills); ISM
Port-State-Control detentions.
Composite Risk
Strong, corroborated adverse evidence: a detention, sanctions exposure or an AIS-gap / behavioural signal.
A coverage-weighted blend of the 3 components we could read for this hull; the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Estimated
Other · summer draught 5 m · 19.7 t per cm immersion
Estimate only: modelled from deadweight (deadweight regression) using a first-principles hydrostatic model, not measured hydrostatic tables. The design draught it is anchored to is unreliable across the fleet.
Commercial
Price it in the Route Planner between any two commercial ports: ballast and laden legs, two fuels at live bunker prices, port and canal costs, the weather on the way, and the TCE set against the market.
Typical General cargo speed and burn. Replace them with the ship's own figures in the planner.
Explore More