
Technical Specifications
Intelligence
Verified reported figure. Band is peer-relative, not official IMO CII.
Compliance
Cold room, cold room cleanliness, cold room temperature; Fire alarm; Oil filtering equipment; Auxiliary engine; Oil record book; Endorsement by flagstate; ISM; Charts; Nautical publications
Voyage or passage plan; Garbage management plan; Fire doors/openings in fire-resisting divisions; Ready availability of fire fighting equipment; Beams, frames, floors-corrosion; Maintenance and inspections; Fire fighting equipment and appliances; Evaluation of crew performance (fire drills); ISM
Port-State-Control detentions.
Composite Risk
Strong, corroborated adverse evidence — a detention, sanctions exposure or an AIS-gap / behavioural signal.
A coverage-weighted blend of the 3 components we could read for this hull — the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Estimated
Other · summer draught 5 m · 19.7 t per cm immersion
Estimate only — modelled from deadweight (deadweight regression) using a first-principles hydrostatic model, not measured hydrostatic tables. The design draught it is anchored to is unreliable across the fleet.
Commercial
Explore More