- MMSI
- 270258000
- Call Sign
- OL6493
Technical Specifications
Key Figures
Live Tracking
Current Position
Intelligence
Risk & Sustainability
Operational Status
Activity
Under way but in the slow band — effective capacity voluntarily withdrawn.
Read from the single most-recent AIS broadcast we hold for this hull — we keep no position history, so this is a point-in-time posture, not a dwell inference. Derived in-house from our own AIS feed; weight it by the broadcast age above.
Port calls
4 recent · AIS-detectedArrivals, time in port and the load/discharge inferred from the draught change — detected from AIS track history. An open call means the vessel is still in port (no departure observed yet).
- no cargo change→ · 14 h in port· draught 2.1→2.1 m
- no cargo change→ · 14 h in port· draught 2.1→2.1 m
- Loaded→ · 21 h in port· draught 1.0→2.1 m
- Discharged→ · 43 h in port· draught 2.2→1.0 m
Method: each call is a run of fixes inside a port’s geofence confirmed by a stop (or an AIS gap); load/discharge is the sign of the draught delta over the call. Indicative — arrivals before our AIS history began read from the first observation.
Where it waits
4 ports · 3.8 days totalTime-in-port summed by port from the AIS-detected port-call history — the ports this vessel has spent the most time at, longest first.
- Terneuzen· Netherlands43 h1 call · 43 h avg 1 discharge
- Zandvliet· Belgium21 h1 call · 21 h avg 1 load
- Tuil· Netherlands14 h1 call · 14 h avg
- Elten· Germany14 h1 call · 14 h avg
Based on 4 completed calls observed since — open calls (no departure yet) are excluded. The distribution sharpens as AIS history accrues.
Composite Risk
Risk Score
Some elevated factors — typically age or a lower-graded flag — but no acute ship-specific flag.
A coverage-weighted blend of the single component we could read for this hull — the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. This headline is flagged low-confidence (a thin or structural-only read) and should not be treated as a verdict. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Commercial
Voyage Estimate
Explore More
Similar Vessels
Community
Vessel Comments