
Technical Specifications
Intelligence
Compliance
ISM; Garbage shipboard handling; Garbage management plan; Pilot ladders and hoist/pilot transfer arrangements; Embarkation arrangement survival craft; Rescue boats; Manning specified by the minimum safe manning doc; Minimum Safe Manning Document; Launching arrangements for rescue boats; Immersion suits; International Oil Pollution Prevention (IOPP); Fire drills; Abandon ship drills; Fire pumps and its pipes; Fire control plan - all; Personal equipment for fire safety; Fire-dampers; Main installation; Radar; Emergency equipment for 2-way comm.; Satellite EPIRB 406MHz; Magnetic compass; On board training and instructions; Charts; Nautical publications; Ventilators, air pipes, casings; Lifebuoys incl. provision and disposition; Electrical installations in general; Navigation bridge visibility; Emergency, lighting,batteries and switches; BNWAS; Machinery controls alarm; Propulsion main engine; Galley, handlingroom (maintenance)
Seafarers' employment agreement (SEA); Rescue boats; Endorsement by flagstate; Railing, gangway, walkway and means for safe passage; Cargo & other hatchways; Long-range identification and tracking system (LRIT)
Port-State-Control detentions.
Composite Risk
Strong, corroborated adverse evidence: a detention, sanctions exposure or an AIS-gap / behavioural signal.
A coverage-weighted blend of the 3 components we could read for this hull; the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Estimated
Other · summer draught 2.7 m · 8.2 t per cm immersion
Estimate only: modelled from deadweight (deadweight regression) using a first-principles hydrostatic model, not measured hydrostatic tables. The design draught it is anchored to is unreliable across the fleet.
Commercial
Price it in the Route Planner between any two commercial ports: ballast and laden legs, two fuels at live bunker prices, port and canal costs, the weather on the way, and the TCE set against the market.
Typical Coaster speed and burn. Replace them with the ship's own figures in the planner.
Explore More