
Technical Specifications
Overview
Norwegian Epic is a cruise ship of the Norwegian Cruise Line built under NCL's F3 Project by the STX Europe Chantiers de l'Atlantique shipyard in Saint-Nazaire, France. When launched in 2010 she was the third largest cruise ship in the world. Two ships in the Epic class were ordered by NCL in November 2006, with an option for a third vessel that was not exercised. A dispute between NCL and STX initially resulted in the construction of both ships being placed on hold until a new agreement was reached. The agreement called for completion of the first ship; the second ship was cancelled in 2008. The sole remaining ship, Norwegian Epic, was delivered to NCL on 17 June 2010. After completion and acceptance, Norwegian Epic sailed on Thursday 24 June 2010 from Southampton to New York.
Intelligence
Verified reported figure. Band is peer-relative, not official IMO CII.
Composite Risk
Some elevated factors (typically age or a lower-graded flag), but no acute ship-specific flag.
A coverage-weighted blend of the single component we could read for this hull; the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. This headline is flagged low-confidence (a thin or structural-only read) and should not be treated as a verdict. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Commercial
Price it in the Route Planner between any two commercial ports: ballast and laden legs, two fuels at live bunker prices, port and canal costs, the weather on the way, and the TCE set against the market.
Fleet Management

Visual Archive