
Technical Specifications
Overview
MS Sovereign (formerly Sovereign of the Seas) was one of three large cruise ships of the Sovereign class operated by Pullmantur Cruises and formerly by Royal Caribbean International. When she was completed in 1987, Sovereign of the Seas was the world's largest passenger ship. On 24 June 2020, due to economic losses caused by COVID-19 pandemic, Sovereign arrived and was beached at Aliağa, Turkey, where she was dismantled.
Composite Risk
Multiple adverse factors, or a hard ship-specific signal, lift this hull above the fleet norm.
A coverage-weighted blend of the single component we could read for this hull; the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. This headline is flagged low-confidence (a thin or structural-only read) and should not be treated as a verdict. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Commercial
Price it in the Route Planner between any two commercial ports: ballast and laden legs, two fuels at live bunker prices, port and canal costs, the weather on the way, and the TCE set against the market.

Visual Archive