
Technical Specifications
Intelligence
Compliance
Fire prevention Spaces containing highly flammable store shall be; Ventilation Heating work. After survey, no change shall be made to machinery or; Certificates of competency All seafarers serving onboard who are required to be; Safety and environmental The company and ship shall comply with the
Number/composition; Other (Safety In General) Deficiencies which may be deemed to pose a danger to; Oil discharge mon/contr; Safety and environmental; Oil record book The Oil Record Book, whether as a part of the ship's
Port-State-Control detentions.
Composite Risk
Strong, corroborated adverse evidence: a detention, sanctions exposure or an AIS-gap / behavioural signal.
A coverage-weighted blend of the 3 components we could read for this hull; the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Estimated
Other · summer draught 5 m · 9.1 t per cm immersion
Estimate only: modelled from deadweight (deadweight regression) using a first-principles hydrostatic model, not measured hydrostatic tables. The design draught it is anchored to is unreliable across the fleet.
Commercial
Price it in the Route Planner between any two commercial ports: ballast and laden legs, two fuels at live bunker prices, port and canal costs, the weather on the way, and the TCE set against the market.
Typical Ro-Ro speed and burn. Replace them with the ship's own figures in the planner.
Explore More