
Technical Specifications
Intelligence
Verified reported figure. Band is peer-relative, not official IMO CII.
Compliance
Certificate for rating for watchkeeping; Beams, frames, floors-corrosion; Bulkheads - cracking; Voyage data recorder (VDR) / Simplified Voyage data recorder (S-VDR); Bridge operation; Dangerous areas; Scuppers, inlets and discharges; Auxiliary engine; Fire doors/openings in fire-resisting divisions; Evaluation of crew performance (fire drills); ISM
Engine International Air Pollution Prev. Cert.; Charts; Certificate for rating for watchkeeping; Certificate for rating for watchkeeping; Manning specified by the minimum safe manning doc; Medical certificate; Distress flares; Line-throwing appliance; Inflatable liferafts; Medical Equipment, medical chest, medical guide; Voyage or passage plan; ISM
Charts; BNWAS; Fixed fire extinguishing installation; Emergency source of power - Emergency generator; Fire drills; Lifeboats; ISM
Port-State-Control detentions.
Composite Risk
Strong, corroborated adverse evidence — a detention, sanctions exposure or an AIS-gap / behavioural signal.
A coverage-weighted blend of the 3 components we could read for this hull — the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Estimated
Other · summer draught 2.2 m · 23.2 t per cm immersion
Estimate only — modelled from deadweight (deadweight regression) using a first-principles hydrostatic model, not measured hydrostatic tables. The design draught it is anchored to is unreliable across the fleet.
Commercial
Explore More