
Technical Specifications
Intelligence
Compliance
On 10 January 2019, the vehicle carrier "LUMINOUS ACE" reported a machinery failure while underway to New Westminster, BC. The crew made repairs and the vessel continued its voyage with tug escort.
On 24 June 2015, the car carrier "LUMINOUS ACE", under the conduct of a pilot, reported a propulsion failure whilst docking at Annacis Auto Terminal, Delta, BC. The cause of the failure was not determined.
Recorded marine occurrences naming this vessel.
Detection The fire detection and alarm system shall be kept in; Safety and environmental The Safety Management System shall be maintained in
Port-State-Control detentions.
Composite Risk
Multiple adverse factors, or a hard ship-specific signal, lift this hull above the fleet norm.
A coverage-weighted blend of the 3 components we could read for this hull — the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Estimated
Other · summer draught 7.98 m · 29.6 t per cm immersion
Estimate only — modelled from deadweight (deadweight only) using a first-principles hydrostatic model, not measured hydrostatic tables. The design draught it is anchored to is unreliable across the fleet.
Commercial
Explore More