
Technical Specifications
Intelligence
Compliance
Fire drills; Inflatable liferafts; Maintenance of Life Saving Appliances; Rescue boats; Charts; Electrical; Electrical; ISM
Voyage or passage plan; Cargo Ship Safety Equipment (including exemption); Other (fire safety); Electrical installations in general; Other (fire safety); Fire drills; ISM
Electrical installations in general; Wheelhouse -door -window; Doors; Crew familiarization with Emergency Systems; Fire doors/openings in fire-resisting divisions; Fire patrol; Fire pumps and its pipes; Fire-dampers; Ventilation; Establishment of working language onboard; Launching arrangements for rescue boats; On board training and instructions; Propulsion main engine; Auxiliary engine; Oil filtering equipment; Sewage treatment plant; Garbage shipboard handling; Galley, handlingroom (maintenance); Lighting (Working spaces); Heating, air conditioning and ventilation; Winches & capstans; Fire drills; Abandon ship drills
Propulsion main engine; ISM
Port-State-Control detentions.
Composite Risk
Strong, corroborated adverse evidence — a detention, sanctions exposure or an AIS-gap / behavioural signal.
A coverage-weighted blend of the 3 components we could read for this hull — the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Estimated
Other · summer draught 5.7 m · 9 t per cm immersion
Estimate only — modelled from deadweight (hull geometry) using a first-principles hydrostatic model, not measured hydrostatic tables. The design draught it is anchored to is unreliable across the fleet.
Commercial
Explore More