
Technical Specifications
Intelligence
Verified reported figure. Band is peer-relative, not official IMO CII.
Compliance
On 15 February 2001, the master of the "DEGERO" became aware of cracks in no4 DB ballast tank. Repairs were undertaken in Baie-Comeau on 22 February 2001.
Recorded marine occurrences naming this vessel.
Charts; Means of escape; Fire fighting equipment and appliances; Fire detection and alarm system; Fire doors/openings in fire-resisting divisions; ISM; Division - decks,bulkheads and penetrations
Anchoring devices; Operational readiness of lifesaving appliances; Lifeboats
Nautical publications; Echo sounder; Sewage treatment plant; Auxiliary engine; Fire doors/openings in fire-resisting divisions; ISM; Voyage or passage plan; Fire drills; Means of escape
Port-State-Control detentions.
Composite Risk
Strong, corroborated adverse evidence — a detention, sanctions exposure or an AIS-gap / behavioural signal.
A coverage-weighted blend of the 3 components we could read for this hull — the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Estimated
Other · summer draught 4.5 m · 21.2 t per cm immersion
Estimate only — modelled from deadweight (deadweight regression) using a first-principles hydrostatic model, not measured hydrostatic tables. The design draught it is anchored to is unreliable across the fleet.
Commercial
Explore More