
Technical Specifications
Intelligence
Compliance
Emergency, lighting,batteries and switches; Inflatable liferafts; Ready availability of fire fighting equipment; Voyage data recorder (VDR) / Simplified Voyage data recorder (S-VDR); Non-payment of wages
ISM; Hull damage impairing seaworthiness; Tonnage certificate; On board training and instructions; Fire drills; Abandon ship drills; Lifejackets incl.provision and disposition; Immersion suits; Cargo Securing Manual; Personal equipment for fire safety; Lifeboats; Nautical publications; Charts; Magnetic compass; Auxiliary engine; Gyro compass; Machinery controls alarm; Lights, shapes, sound-signals
Port-State-Control detentions.
Composite Risk
Strong, corroborated adverse evidence: a detention, sanctions exposure or an AIS-gap / behavioural signal.
A coverage-weighted blend of the 3 components we could read for this hull; the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Estimated
Other · summer draught 5.5 m · 9.8 t per cm immersion
Estimate only: modelled from deadweight (deadweight regression) using a first-principles hydrostatic model, not measured hydrostatic tables. The design draught it is anchored to is unreliable across the fleet.
Commercial
Price it in the Route Planner between any two commercial ports: ballast and laden legs, two fuels at live bunker prices, port and canal costs, the weather on the way, and the TCE set against the market.
Typical Ro-Ro speed and burn. Replace them with the ship's own figures in the planner.
Fleet Management

Visual Archive
Explore More