
Technical Specifications
Intelligence
Verified reported figure. Band is peer-relative, not official IMO CII.
Compliance
Fire drills; Division - decks,bulkheads and penetrations; Bridge operation; Voyage data recorder (VDR) / Simplified Voyage data recorder (S-VDR); Nautical publications; Fire-dampers; Fire doors/openings in fire-resisting divisions; Ballast, fuel and other tanks; Emergency, lighting,batteries and switches; Propulsion main engine; Cold room, cold room cleanliness, cold room temperature; ISM; Wages; Operation of Fire protection systems; Pumping, piping and discharge arrangements
Operational readiness of; Company responsibility and
Port-State-Control detentions.
Composite Risk
Strong, corroborated adverse evidence — a detention, sanctions exposure or an AIS-gap / behavioural signal.
A coverage-weighted blend of the 3 components we could read for this hull — the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Estimated
Other · summer draught 9.2 m · 30.7 t per cm immersion
Estimate only — modelled from deadweight (hull geometry) using a first-principles hydrostatic model, not measured hydrostatic tables. The design draught it is anchored to is unreliable across the fleet.
Commercial

Visual Archive
Explore More