
Technical Specifications
Intelligence
Compliance
Maximum hours of work or minimum hours of rest; Document of Compliance (DoC/ ISM); Conformance Test Report; Record of drills and steering gear tests; Enclosed space entry and rescue drills; Abandon ship drills; Fire drills; Emergency fire pump and its pipes; Gyro compass; Fire detection and alarm system; Jacketed high pressure lines and oil leakage alarm; Fixed fire extinguishing installation; Beams, frames, floors-corrosion; Launching arrangements for survival craft; Cleanliness of engine room; ISM
Hull damage impairing seaworthiness; Compass correction log; ISM; Ballast, fuel and other tanks; Voyage or passage plan; Navigation records; BNWAS
Port-State-Control detentions.
Composite Risk
Strong, corroborated adverse evidence — a detention, sanctions exposure or an AIS-gap / behavioural signal.
A coverage-weighted blend of the 3 components we could read for this hull — the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Estimated
Other · summer draught 5 m · 7.2 t per cm immersion
Estimate only — modelled from deadweight (hull geometry) using a first-principles hydrostatic model, not measured hydrostatic tables. The design draught it is anchored to is unreliable across the fleet.
Commercial
Explore More