
Technical Specifications
Intelligence
Compliance
Charts; Fire drills; Bulkheads – construction; ISM; Reserve source of energy
Maintenance of Life Saving Appliances; Fire detection and alarm system; Long-range identification and tracking system (LRIT); BNWAS; Rescue boats; Nautical publications; International Oil Pollution Prevention (IOPP); Enclosed space entry and rescue drills; Sleeping room, additional spaces; Atmosphere testing instrument; ISM
Civil liability for Bunker oil pollution damage cert; International Oil Pollution Prevention (IOPP); Non-payment of wages; Sanitary Facilities; Provisions quantity; ISM
Port-State-Control detentions.
Composite Risk
Strong, corroborated adverse evidence — a detention, sanctions exposure or an AIS-gap / behavioural signal.
A coverage-weighted blend of the 2 components we could read for this hull — the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Estimated
Other · summer draught 4.3 m · 4.7 t per cm immersion
Estimate only — modelled from deadweight (hull geometry) using a first-principles hydrostatic model, not measured hydrostatic tables. The design draught it is anchored to is unreliable across the fleet.
Commercial
Explore More