
Technical Specifications
Intelligence
Compliance
Charts; Fire drills; Bulkheads – construction; ISM; Reserve source of energy
Maintenance of Life Saving Appliances; Fire detection and alarm system; Long-range identification and tracking system (LRIT); BNWAS; Rescue boats; Nautical publications; International Oil Pollution Prevention (IOPP); Enclosed space entry and rescue drills; Sleeping room, additional spaces; Atmosphere testing instrument; ISM
Civil liability for Bunker oil pollution damage cert; International Oil Pollution Prevention (IOPP); Non-payment of wages; Sanitary Facilities; Provisions quantity; ISM
Port-State-Control detentions.
Composite Risk
Strong, corroborated adverse evidence: a detention, sanctions exposure or an AIS-gap / behavioural signal.
A coverage-weighted blend of the 2 components we could read for this hull; the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Estimated
Other · summer draught 4.3 m · 4.7 t per cm immersion
Estimate only: modelled from deadweight (hull geometry) using a first-principles hydrostatic model, not measured hydrostatic tables. The design draught it is anchored to is unreliable across the fleet.
Commercial
Price it in the Route Planner between any two commercial ports: ballast and laden legs, two fuels at live bunker prices, port and canal costs, the weather on the way, and the TCE set against the market.
Typical Coaster speed and burn. Replace them with the ship's own figures in the planner.
Explore More