
Technical Specifications
Intelligence
Compliance
Certificates for master and officers; Manning specified by the minimum safe manning doc; ISM; Reserve source of energy; VHF radio installation; Voyage data recorder (VDR) / Simplified Voyage data recorder (S-VDR); Inflatable liferafts; Lifeboats; Closing devices/watertight doors; Fixed fire extinguishing installation; Charts; Fire drills
Emergency fire pump and its pipes; Fire detection and alarm system; Fire-dampers; Lifeboats; Medical certificate; Emergency, lighting,batteries and switches; Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces; Doors; ISM
Port-State-Control detentions.
Composite Risk
Strong, corroborated adverse evidence — a detention, sanctions exposure or an AIS-gap / behavioural signal.
A coverage-weighted blend of the 3 components we could read for this hull — the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Estimated
Other · summer draught 6.18 m · 16.6 t per cm immersion
Estimate only — modelled from deadweight (deadweight only) using a first-principles hydrostatic model, not measured hydrostatic tables. The design draught it is anchored to is unreliable across the fleet.
Commercial
Explore More