
Technical Specifications
Overview
HNLMS Van Galen (F834) (Dutch: Hr.Ms. Van Galen) is a ship of the Karel Doorman class of multi-purpose frigates of the Royal Netherlands Navy. Built by the shipyard Koninklijke Schelde Groep in Vlissingen. The ship is named after captain and convoy commander Johan van Galen and served from 1994 to 2008 with the Dutch navy. The radio call sign of the frigate was "PAMG". In 2009 HNLMS Van Galen was sold to Portugal. The ship was transferred in 2010 to the Portuguese Navy, where the ship was put into service as the NRP Dom Francisco de Almeida (F334). HNLMS Van Galen is one of eight Karel Doorman-class frigates and built at the Koninklijke Schelde Groep yard in Vlissingen. The keel laying took place on 7 June 1990 and the launching on 21 November 1992. The ship was put into service on 1 December 1994. The ship participated in the UNIFIL mission off the coast of Lebanon.
Composite Risk
Multiple adverse factors, or a hard ship-specific signal, lift this hull above the fleet norm.
A coverage-weighted blend of the single component we could read for this hull; the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. This headline is flagged low-confidence (a thin or structural-only read) and should not be treated as a verdict. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Commercial
Price it in the Route Planner between any two commercial ports: ballast and laden legs, two fuels at live bunker prices, port and canal costs, the weather on the way, and the TCE set against the market.

Visual Archive