
Technical Specifications
Overview
HMCS Provider was a replenishment oiler and sole ship of her class of first the Royal Canadian Navy and later the Canadian Forces. She was the first dedicated auxiliary oiler replenishment ship commissioned for the Royal Canadian Navy in 1963, and the largest ship built in Canada to that date. Originally assigned to the East Coast, her open deck made her vulnerable and she was reassigned to the West coast. The ship was paid off in 1998, sold for scrap and broken up in Turkey in 2003.
Composite Risk
Multiple adverse factors, or a hard ship-specific signal, lift this hull above the fleet norm.
A coverage-weighted blend of the single component we could read for this hull; the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. This headline is flagged low-confidence (a thin or structural-only read) and should not be treated as a verdict. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Commercial
Price it in the Route Planner between any two commercial ports: ballast and laden legs, two fuels at live bunker prices, port and canal costs, the weather on the way, and the TCE set against the market.

Visual Archive