
Technical Specifications
Intelligence
Verified reported figure. Band is peer-relative, not official IMO CII.
Compliance
Fire drills; Charts; Voyage or passage plan; 15 PPM Alarm arrangmts.; Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces; Fixed fire extinguishing installation; ISM
Fire doors/openings in fire-resisting divisions; Evaluation of crew performance (fire drills); ISM; Fire pumps and its pipes; Bilge pumping arrangements; Charts; Fire detection and alarm system; Lifeboats; Enhanced survey programme (ESP); Propulsion main engine; Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces; Auxiliary engine; Galley, handlingroom (maintenance); Steering gear; Certificates for master and officers
Evaluation of crew performance (fire drills); Rescue boats; Abandon ship drills; ISM
Port-State-Control detentions.
Composite Risk
Strong, corroborated adverse evidence — a detention, sanctions exposure or an AIS-gap / behavioural signal.
A coverage-weighted blend of the 3 components we could read for this hull — the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Estimated
Bulker · summer draught 7.3 m · 13.8 t per cm immersion
Estimate only — modelled from deadweight (hull geometry) using a first-principles hydrostatic model, not measured hydrostatic tables. The design draught it is anchored to is unreliable across the fleet.
density DWT/GT=1.48 is consistent with declared bulker
Declared type is consistent with the class implied by the vessel’s size signals. Inferred via our shared size-based classifier.
Commercial

Visual Archive
Explore More