
Intelligence
Verified reported figure. Band is peer-relative, not official IMO CII.
Compliance
Cleanliness of engine room; Steam pipes, pressure pipes, wires (insulation); Insulation wetted through (oil); Electrical; Steam pipes, pressure pipes, wires (insulation); Fire drills; Abandon ship drills
Emergency, lighting,batteries and switches; Fire detection and alarm system; Machinery controls alarm; Closing devices/watertight doors; Steering gear; Scuppers, inlets and discharges; Emergency source of power - Emergency generator; Stability/strength/loading information and instruments; ISM; Bilge pumping arrangements; Bilge pumping arrangements
Port-State-Control detentions.
Composite Risk
Strong, corroborated adverse evidence — a detention, sanctions exposure or an AIS-gap / behavioural signal.
A coverage-weighted blend of the single component we could read for this hull — the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. This headline is flagged low-confidence (a thin or structural-only read) and should not be treated as a verdict. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Commercial

Visual Archive