
Technical Specifications
Intelligence
Verified reported figure. Band is peer-relative, not official IMO CII.
Compliance
Heating, air conditioning and ventilation; Fire doors/openings in fire-resisting divisions; ISM; Evaluation of crew performance (fire drills); Ready availability of fire fighting equipment; Fire detection and alarm system; Rescue boat inventory; Fire fighting equipment and appliances; Launching arrangements for rescue boats; Fixed fire extinguishing installation; Lights, shapes, sound-signals; Manholes/flush scuttles; Sewage treatment plant; Doors; Steering gear; Maintenance of Fire protection systems; Ventilators, air pipes, casings; Decks - corrosion
Ballast, fuel and other tanks; Closing devices/watertight doors; Record book of engine parameters; Operational procedures for engines or equipment; Fire doors/openings in fire-resisting divisions; ISM; Fire doors/openings in fire-resisting divisions; Launching arrangements for survival craft; Sleeping room, additional spaces; Sanitary Facilities; Cold room, cold room cleanliness, cold room temperature
Port-State-Control detentions.
Composite Risk
Strong, corroborated adverse evidence — a detention, sanctions exposure or an AIS-gap / behavioural signal.
A coverage-weighted blend of the 3 components we could read for this hull — the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Estimated
Other · summer draught 5.1 m · 18.9 t per cm immersion
Estimate only — modelled from deadweight (hull geometry) using a first-principles hydrostatic model, not measured hydrostatic tables. The design draught it is anchored to is unreliable across the fleet.
Commercial

Visual Archive
Explore More