
Technical Specifications
Intelligence
Verified reported figure. Band is peer-relative, not official IMO CII.
Compliance
Voyage data recorder (VDR) / Simplified Voyage data recorder (S-VDR); Fire doors/openings in fire-resisting divisions; Fixed fire extinguishing installation; Evaluation of crew performance (fire drills); Emergency fire pump and its pipes; Bilge pumping arrangements; Cargo & other hatchways; Decks - corrosion; Machinery controls alarm; ISM; Stability/strength/loading information and instruments
Heating, air conditioning and ventilation; Fire doors/openings in fire-resisting divisions; ISM; Evaluation of crew performance (fire drills); Ready availability of fire fighting equipment; Fire detection and alarm system; Rescue boat inventory; Fire fighting equipment and appliances; Launching arrangements for rescue boats; Fixed fire extinguishing installation; Lights, shapes, sound-signals; Manholes/flush scuttles; Sewage treatment plant; Doors; Steering gear; Maintenance of Fire protection systems; Ventilators, air pipes, casings; Decks - corrosion
Ballast, fuel and other tanks; Closing devices/watertight doors; Record book of engine parameters; Operational procedures for engines or equipment; Fire doors/openings in fire-resisting divisions; ISM; Fire doors/openings in fire-resisting divisions; Launching arrangements for survival craft; Sleeping room, additional spaces; Sanitary Facilities; Cold room, cold room cleanliness, cold room temperature
Port-State-Control detentions.
Composite Risk
Strong, corroborated adverse evidence: a detention, sanctions exposure or an AIS-gap / behavioural signal.
A coverage-weighted blend of the 3 components we could read for this hull; the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Estimated
Other · summer draught 5.1 m · 18.9 t per cm immersion
Estimate only: modelled from deadweight (hull geometry) using a first-principles hydrostatic model, not measured hydrostatic tables. The design draught it is anchored to is unreliable across the fleet.
Commercial
Price it in the Route Planner between any two commercial ports: ballast and laden legs, two fuels at live bunker prices, port and canal costs, the weather on the way, and the TCE set against the market.
Typical Coaster speed and burn. Replace them with the ship's own figures in the planner.

Visual Archive
Explore More