
Technical Specifications
Live Tracking
Most time stopped at Port of Istanbul — 8 h across 3 stays.
Derived from the AIS track — runs of near-zero speed (anchored, moored or drifting) snapped to the nearest port. Builds up as we observe the vessel.
Resolved from the live AIS destination. Distance is the real sea route (around land and through canals). “Off the port” is steaming time only; “likely alongside” adds the wait this port has actually kept comparable ships for. The queue is a typical case, not a promise — berth waits vary far more than they average. A destination is the crew’s stated intent, not a confirmed fixture.
Intelligence
Verified reported figure. Band is peer-relative, not official IMO CII.
AIS-derived from our live feed.
Compliance
Minimum Safe Manning Document; Nautical publications; Voyage data recorder (VDR) / Simplified Voyage data recorder (S-VDR); Engine International Air Pollution Prev. Cert.; Certificates for master and officers; Fire drills; Voyage or passage plan; Steering gear; ISM; Fire detection and alarm system; Radio log (diary)
Cargo Securing Manual; Voyage data recorder (VDR) / Simplified Voyage data recorder (S-VDR); Nautical publications; Nautical publications; Bridge operation; Compass correction log; Fire doors/openings in fire-resisting divisions; Emergency, lighting,batteries and switches; Certificate or documentary evidence of financial security for repatriation; Certificate or documentary evidence of financial security relating to shipowners liability; ISM
Seafarers' employment agreement (SEA); Emergency source of power - Emergency generator; Evaluation of crew performance (fire drills); Voyage or passage plan; Other (certificates); ISM
Port-State-Control detentions.
Operational Status
Under way but in the slow band — effective capacity voluntarily withdrawn.
Read from the single most-recent AIS broadcast we hold for this hull — we keep no position history, so this is a point-in-time posture, not a dwell inference. Derived in-house from our own AIS feed; weight it by the broadcast age above.
Arrivals, time in port and the load/discharge inferred from the draught change — detected from AIS track history. An open call means the vessel is still in port (no departure observed yet).
Method: each call is a run of fixes inside a port’s geofence confirmed by a stop (or an AIS gap); load/discharge is the sign of the draught delta over the call. Indicative — arrivals before our AIS history began read from the first observation.
Time-in-port summed by port from the AIS-detected port-call history — the ports this vessel has spent the most time at, longest first.
Based on 4 completed calls observed since — open calls (no departure yet) are excluded. The distribution sharpens as AIS history accrues.
Composite Risk
Strong, corroborated adverse evidence — a detention, sanctions exposure or an AIS-gap / behavioural signal.
A coverage-weighted blend of the 3 components we could read for this hull — the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Estimated
Other · summer draught 4 m · 15.6 t per cm immersion
Estimate only — modelled from deadweight (deadweight regression) using a first-principles hydrostatic model, not measured hydrostatic tables. The design draught it is anchored to is unreliable across the fleet.
Commercial
Explore More