
Technical Specifications
Intelligence
Compliance
Fire drills; Charts; Heating, air conditioning and ventilation; Radio log (diary); Security awareness training / designated security duties training; Echo sounder; Seafarers' employment agreement (SEA); Medical certificate; Evidence of Basic Training; Bridge operation; ISM
Cargo Ship Safety Construction (including exempt.); Voyage data recorder (VDR) / Simplified Voyage data recorder (S-VDR); Fire drills; Sanitary Facilities; Nautical publications; Unattended Machinery Spaces (UMS) Evidence; Ventilation; Cleanliness of engine room; Bulwarks and freeing ports; Fire doors/openings in fire-resisting divisions; Fire control plan; Doors; ISM
Port-State-Control detentions.
Composite Risk
Strong, corroborated adverse evidence: a detention, sanctions exposure or an AIS-gap / behavioural signal.
A coverage-weighted blend of the 3 components we could read for this hull; the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Estimated
Other · summer draught 6.8 m · 15 t per cm immersion
Estimate only: modelled from deadweight (hull geometry) using a first-principles hydrostatic model, not measured hydrostatic tables. The design draught it is anchored to is unreliable across the fleet.
Commercial
Price it in the Route Planner between any two commercial ports: ballast and laden legs, two fuels at live bunker prices, port and canal costs, the weather on the way, and the TCE set against the market.
Typical Coaster speed and burn. Replace them with the ship's own figures in the planner.
Explore More