
Technical Specifications
Intelligence
Compliance
Fire drills; Charts; Heating, air conditioning and ventilation; Radio log (diary); Security awareness training / designated security duties training; Echo sounder; Seafarers' employment agreement (SEA); Medical certificate; Evidence of Basic Training; Bridge operation; ISM
Cargo Ship Safety Construction (including exempt.); Voyage data recorder (VDR) / Simplified Voyage data recorder (S-VDR); Fire drills; Sanitary Facilities; Nautical publications; Unattended Machinery Spaces (UMS) Evidence; Ventilation; Cleanliness of engine room; Bulwarks and freeing ports; Fire doors/openings in fire-resisting divisions; Fire control plan; Doors; ISM
Port-State-Control detentions.
Composite Risk
Strong, corroborated adverse evidence — a detention, sanctions exposure or an AIS-gap / behavioural signal.
A coverage-weighted blend of the 3 components we could read for this hull — the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Estimated
Other · summer draught 6.8 m · 15 t per cm immersion
Estimate only — modelled from deadweight (hull geometry) using a first-principles hydrostatic model, not measured hydrostatic tables. The design draught it is anchored to is unreliable across the fleet.
Commercial
Explore More