
Technical Specifications
Intelligence
Verified reported figure. Band is peer-relative, not official IMO CII.
Compliance
Ventilators, air pipes, casings; Speed and distance indicator; Personal equipment for fire safety; Rescue boats; ISM; Engine International Air Pollution Prev. Cert.; Sewage comminuting and disinfecting system
Speed and distance indicator; Fire alarm; Railing, gangway, walkway and means for safe passage; Charts; Declaration of Maritime Labour Compliance (Part I and II); Maritime Labour Certificate; Launching arrangements for rescue boats; ISM
Port-State-Control detentions.
Composite Risk
Multiple adverse factors, or a hard ship-specific signal, lift this hull above the fleet norm.
A coverage-weighted blend of the 2 components we could read for this hull — the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Estimated
Other · summer draught 5.9 m · 32.7 t per cm immersion
Estimate only — modelled from deadweight (deadweight regression) using a first-principles hydrostatic model, not measured hydrostatic tables. The design draught it is anchored to is unreliable across the fleet.
Commercial
Explore More