
Technical Specifications
Intelligence
Compliance
Propulsion main engine; Rescue boats; Emergency towing arrangements and procedures; Rescue boats; Launching arrangements for rescue boats; Signs, indications; Maintenance and inspections; Evaluation of crew performance (fire drills); Fire pumps and its pipes; Cargo & other hatchways; Provisions quantity; Cleanliness of engine room; Sanitary Facilities; Fire detection and alarm system
Port-State-Control detentions.
Composite Risk
Strong, corroborated adverse evidence — a detention, sanctions exposure or an AIS-gap / behavioural signal.
A coverage-weighted blend of the 3 components we could read for this hull — the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Estimated
Other · summer draught 4.43 m · 7.9 t per cm immersion
Estimate only — modelled from deadweight (deadweight only) using a first-principles hydrostatic model, not measured hydrostatic tables. The design draught it is anchored to is unreliable across the fleet.
Commercial
Explore More