
Technical Specifications
Intelligence
Compliance
Winches & capstans; Anchoring devices; Mooring Ropes/Lines and Wires; Dangerous areas; Heating, air conditioning and ventilation; Cleanliness; Procedure for complaint under MLC,2006; Voyage or passage plan; Charts; Nautical publications; Compass correction log; Galley, handlingroom (maintenance); Electrical; Sanitary Facilities; Overloading; Freeboard marks; Ventilators, air pipes, casings; Railing, gangway, walkway and means for safe passage; Decks - corrosion; Fire control plan - all; Fire pumps and its pipes; Emergency fire pump and its pipes; Fire detection and alarm system; On board training and instructions; Fire safety operational booklet; Other (fire safety); Fire drills; Cleanliness of engine room; Auxiliary engine; Oil record book; Log-books/compulsory entries; Echo sounder; Other (Structural conditions); ISM
Port-State-Control detentions.
Composite Risk
Strong, corroborated adverse evidence — a detention, sanctions exposure or an AIS-gap / behavioural signal.
A coverage-weighted blend of the 3 components we could read for this hull — the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Estimated
Other · summer draught 6.29 m · 17.3 t per cm immersion
Estimate only — modelled from deadweight (deadweight only) using a first-principles hydrostatic model, not measured hydrostatic tables. The design draught it is anchored to is unreliable across the fleet.
Commercial
Explore More