
Technical Specifications
Overview
Academic Pashin is a replenishment oiler of Project 23130 and the lead vessel of the class. Developed by the Spetssudoproect JSC, it is the first replenishment oiler commissioned with the Russian Navy since the end of the Cold War. The ship is named after the Hero of the Russian Federation Valentin Pashin. She is assigned to the Northern Fleet.
Composite Risk
No strong adverse signal on the components we could read for this hull.
A coverage-weighted blend of the single component we could read for this hull; the weights renormalise over only the components present, so a thin read is never inflated and a hull is never credited a “safe 0” for a signal it has no row for. This headline is flagged low-confidence (a thin or structural-only read) and should not be treated as a verdict. Higher means riskier. Derived in-house from government-open port-State-control, flag, sanctions and our own vessel data; weight it by the coverage above.
Commercial
Price it in the Route Planner between any two commercial ports: ballast and laden legs, two fuels at live bunker prices, port and canal costs, the weather on the way, and the TCE set against the market.

Visual Archive